Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Police chiefs call for PM to prevent early release of PC Harper’s killers

    August 11, 2026

    CoreWeave (CRWV) Q2 earnings report 2026

    August 11, 2026

    Moscow releases former US Marine Robert Gilman after four-year stint in Russian prison

    August 11, 2026
    Facebook X (Twitter) Instagram
    Addison Markets
    • Home
    • USA
    • Europe
    • Business
    • Investing
    • Tech
    • Politics
    • Contact Us
    Addison Markets
    Home»Tech»Nvidia’s Kyber rack system delayed to 2028 over manufacturing snags
    Tech

    Nvidia’s Kyber rack system delayed to 2028 over manufacturing snags

    franperez66q@protonmail.comBy franperez66q@protonmail.comJuly 6, 2026No Comments3 Mins Read
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Telegram Email


    Jensen Huang, chief executive officer of Nvidia Corp., speaks next to a Vera Rubin Ultra Kyber Compute Tray and a Vera Rubin Ultra Kyber NVLink MidPlane during a keynote address at the Nvidia GTC conference in San Jose, California, US, on Monday, March 16, 2026.

    Bloomberg | Bloomberg | Getty Images

    NVIDIA’s next marquee product — the Kyber rack-scale architecture designed to house its 2027 Rubin Ultra chips — has been delayed by more than 12 months to 2028, according to research firm SemiAnalysis, the latest in a string of reported setbacks raising questions about the AI giant’s product roadmap.

    Kyber is a server cabinet that packs 144 of Nvidia’s most powerful chips into a single unit so they can work together as one giant computer, providing the horsepower AI companies need to train and run their most advanced models.

    The design mounts graphics processing units in compute trays that sit vertically instead of horizontally to boost density and reduce latency, and had been slated to debut with Vera Rubin Ultra, Nvidia’s next-generation rack-scale system, in 2027.

    The setback stems from difficulties manufacturing a key circuit board at the heart of the system, SemiAnalysis said in a post on Monday.

    “Kyber NVL144 rack architecture has been delayed to 2028 as the PCB midplane remains challenging from a manufacturability standpoint,” the firm said, referring to a specialized, multi-layer printed circuit board that connects electronic modules within a system.

    NVL576 — a larger system linking eight racks via optical connections — is also likely delayed or limited to small volumes, the research firm said.

    Nvidia did not respond to CNBC’s request for comment.

    The reported delay adds to mounting strains across Nvidia’s product lines, underscoring concerns that Nvidia’s breakneck annual release cadence is colliding with manufacturing limits.

    A backup plan — bolting two of Nvidia’s current-generation racks together for similar power — has also been scrapped after cloud customers rejected the design as awkward and costly to operate. “It has since been cancelled due to heavy pushback from CSPs [cloud service providers] and hyperscalers over its odd design and heavy operational burden,” SemiAnalysis said.

    That leaves Nvidia with “no proven solution to expand the scale-up world size for Rubin Ultra,” SemiAnalysis said, predicting that could give rivals Advanced Micro Devices and Google, whose in-house chips are already winning business from top AI labs, a rare technical opening at the high end of the market.

    Nvidia’s current-generation Rubin systems are in full production and begin shipping this fall to eight cloud partners, including Amazon Web Services, Microsoft Azure and Google Cloud. SemiAnalysis also projects Nvidia’s data-center compute revenue will run 20% above Wall Street consensus in the second half of fiscal 2027.

    Shares of Nvidia fluctuated in premarket trading, last down less than 0.1% at $194.79.

    Choose CNBC as your preferred source on Google and never miss a moment from the most trusted name in business news.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    franperez66q@protonmail.com
    • Website

    Related Posts

    CoreWeave (CRWV) Q2 earnings report 2026

    August 11, 2026

    Used EV buying guide: The $30,000 edition

    August 11, 2026

    Longtime OpenAI executive Brad Lightcap leaves as shakeup at AI lab continues

    August 11, 2026

    A researcher bought noreply.net. Companies started sending him secrets.

    August 11, 2026

    Manus to return as independent company after China blocks Meta deal

    August 11, 2026

    Trump to give Republicans a 3-1 FCC majority, isn’t filling empty Democratic seat

    August 11, 2026
    Leave A Reply Cancel Reply

    Top Reviews
    Editors Picks

    Police chiefs call for PM to prevent early release of PC Harper’s killers

    August 11, 2026

    CoreWeave (CRWV) Q2 earnings report 2026

    August 11, 2026

    Moscow releases former US Marine Robert Gilman after four-year stint in Russian prison

    August 11, 2026

    Used EV buying guide: The $30,000 edition

    August 11, 2026
    © 2026 All right reserved
    • Privacy Policy
    • Terms & Conditions

    Type above and press Enter to search. Press Esc to cancel.