Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Bentley launches Torcal as luxury rivals pull back on electric cars

    September 24, 2026

    No Kings But King Dollar

    September 24, 2026

    Ukraine: Russia welcomes U.S. invite for possible Trump-Putin meeting

    September 24, 2026
    Facebook X (Twitter) Instagram
    Addison Markets Addison Markets
    • Home
    • USA
    • Europe
    • Business
    • Investing
    • Tech
    • Politics
    • Contact Us
    Addison Markets Addison Markets
    Home»Tech»Data centers’ energy demand threatens Trump’s “Made in America” plan
    Tech

    Data centers’ energy demand threatens Trump’s “Made in America” plan

    franperez66q@protonmail.comBy franperez66q@protonmail.comJuly 8, 2026No Comments2 Mins Read
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Telegram Email



    PJM has also forecast that electricity demand in its territory will surpass available supply by 6.6 gigawatts starting in 2027, which the Wall Street Journal describes as equivalent to more than six nuclear power plants.

    No easy fixes

    Some US manufacturers have raised the prices paid by customers to partially offset their own rising electricity bills, or are even considering relocation of their businesses, Reuters reported. The Wall Street Journal highlighted warnings from steel industry executives that production outages could become more likely if local power grids are overwhelmed by demand. Such results would likely undercut the competitiveness and viability of US manufacturing, which the Trump administration claims to have prioritized despite the loss of 83,000 manufacturing jobs in Trump’s first year back in office.

    The White House has touted getting Big Tech companies to pay for new power generation and transmission infrastructure by signing a Ratepayer Protection Pledge, which happens to lack any meaningful enforcement mechanism. The Trump administration also joined state governors in pushing PJM to hold a one-time backstop auction for purchasing new power supply capacity.

    But the United States still faces huge challenges in building enough new power generation and transmission lines to support the energy needs of AI data center demand and US manufacturers, not to mention other businesses and residential customers. The Trump administration’s efforts to stop renewable energy projects involving wind and solar power have also not helped.

    In 2025 alone, the United States saw the cancellation of power projects totaling 266 gigawatts of generation capacity—equivalent to 25 percent of America’s current electricity generation capacity and more than the total electricity generation of Texas, according to Michael Thomas, CEO of the Cleanview data platform that tracks renewable energy and data center projects. Clean energy projects accounted for 93 percent of those project cancellations.

    The Trump administration’s cancellations of various wind power projects certainly represented one contributing factor. But other significant patterns included local opposition to renewable energy projects in states such as Ohio and Indiana that were also courting new data center development, along with a lack of new transmission lines leading to high interconnection costs for new clean energy projects, Thomas said. If US states and the federal government are hoping to support local manufacturing, they may need to start making different choices in addressing the rising energy costs of the data center boom.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    franperez66q@protonmail.com
    • Website

    Related Posts

    Ukrainian drones overwhelm Russian tanks’ new active protection system—for now

    August 19, 2026

    Jim Cramer says the market is too negative — and that’s creating buying opportunities

    August 19, 2026

    “Sabotage”: Experts, lawmakers blast RFK Jr. for destroying healthcare research

    August 18, 2026

    OpenAI rolls out ChatGPT for Teens with more safety protections

    August 18, 2026

    Against all odds, SpaceX finally tugs Starship into port after 24 days at sea

    August 18, 2026

    Economists warn AI-driven market rally is due a sharp correction

    August 18, 2026
    Leave A Reply Cancel Reply

    Top Reviews
    Editors Picks

    Bentley launches Torcal as luxury rivals pull back on electric cars

    September 24, 2026

    No Kings But King Dollar

    September 24, 2026

    Ukraine: Russia welcomes U.S. invite for possible Trump-Putin meeting

    September 24, 2026

    Swiss National Bank holds rates at 0% as inflation stays low

    September 24, 2026
    © 2026 All right reserved
    • Privacy Policy
    • Terms & Conditions

    Type above and press Enter to search. Press Esc to cancel.